Solar Reports in Philippines


Solar feasibility reports for addresses across Philippines, including rooftop potential, indicative system sizing, and local city report links.

Free Solar Report

Country-level solar indicators for Philippines with links to city-level feasibility reports.

Solar Grants and Incentives in Philippines

Data compiled: February 2026

Net Metering Program

The Philippines Net Metering Program allows solar system owners to receive credits for excess electricity exported to the grid. These credits offset electricity consumption when solar production is low, significantly reducing monthly electric bills. The program is available to residential, commercial, and industrial customers with renewable energy systems up to 100kW capacity.

Learn More

Solar Rooftop Program

The Department of Energy promotes solar rooftop installations through various incentives including tax holidays, duty exemptions on imported equipment, and special realty tax rates on equipment for renewable energy facilities. This program aims to increase distributed solar generation across the Philippines and reduce reliance on traditional power sources.

Apply Now

Renewable Energy Act Incentives

Under the Renewable Energy Act of 2008, solar energy developers and users can access income tax holidays for 7 years, duty-free importation of renewable energy equipment, special realty tax rates, net operating loss carry-over, and corporate tax rate reductions. These comprehensive incentives make solar investment more attractive for businesses and homeowners.

Learn More

Key Solar Data for Philippines

Average solar irradiance

0.12 kWh/m²/day

Installed solar capacity

1146.7 GWh potential

Sunshine hours (annual)

2100 hours

Solar potential

Country-level potential available

Local Financing Info for Philippines

Local Financing Options

In Angeles, begin with distribution utility guidance and local bank products for home improvement or SME energy upgrades. Installer-led finance partnerships are increasingly common.

National Financing Programs

Philippine national frameworks (including net-metering rules) can improve cash flow over time. Review interconnection timelines and ensure repayment schedules account for commissioning delays.

Before You Apply

Prepare your latest electricity bills, roof information, and at least two installer proposals. Confirm whether the finance package includes batteries, electrical upgrades, and grid-connection costs, and ask how grants/rebates are applied in your cash-flow timeline.

Useful Links

Ready for your free solar report?

Any address in Philippines. Get your free feasibility report in minutes.

Free Solar Report